Dr. MiltieAtlas by Dr. Miltie™Healthcare Grant Intelligence
Verification Pending - current opportunity open; application closes September 30, 2026Atlas Opportunity Score 62/100
MN-MNDOT-TRANSIT-TECH-2027Minnesota

Minnesota MnDOT Greater Minnesota Transit Technology Grant — 2027

MnDOT's 2027 Greater Minnesota Transit Technology Grant is open to rural and small urban transit agencies currently receiving MnDOT operating assistance, with applications due September 30, 2026 at 11:59 p.m. through BlackCat. Material funding, match, cost and time-zone controls remain under verification.

FundingVerification Pending. The current public MnDOT Technology Grant page does not state a program funding pool or per-applicant award range.
DeadlineSeptember 30, 2026 at 11:59 p.m. The current public MnDOT page does not state a time zone.
Last verifiedSeptember 23, 2026
Required next actionRetrieve or otherwise authoritatively verify the controlling 2026 Technology Grant Instructions and current BlackCat application documents before publication, applicant-specific CRM advancement, package production or ORIGINAL outreach. Confirm funding pool/award range, match/cost share, allowable and ineligible costs, exact required forms/attachments, scoring criteria, procurement requirements, amendments/Q&A controls and the deadline time zone. Then verify a specific eligible Greater Minnesota transit agency, business Contact/email, Email_Opt_Out, permanent hard-bounce status, exact-opportunity CRM/queue/send-history dedupe, and attachment correctness before any ORIGINAL outreach.

Broad Eligibility

Any Greater Minnesota rural or small urban transit agency currently receiving operating assistance from MnDOT. Applications are submitted through BlackCat under the 2026 Application for the 2027 Technology Grant. Required application documents are downloaded from the BlackCat Application tab and must be completed, signed where required and uploaded before submission. Incomplete applications will not be scored.

Atlas Analysis

Atlas Opportunity Score 62/100 conditional. Minnesota-owned MnDOT opportunity with legitimate rural/community mobility and technology value, but not healthcare-specific. N9+ Fit 0/100 at program-control level and QC Healthcare Fit 0/100 at program-control level; neither should be forced into a transit-operations project. Public MnDOT materials verify current status, eligible transit-agency class, BlackCat submission, deadline date/time, award-notification timing and reporting, but material funding, match, detailed cost, form and deadline-time-zone controls remain unresolved. Fail closed against publication, applicant-specific package work and ORIGINAL outreach until the controlling grant instructions/application documents are authoritatively verified.

Minnesota Department of Transportation’s Greater Minnesota Transit Technology Grant is currently open for the 2027 award cycle. The program supports technology investments for rural and small urban transit systems in Greater Minnesota that currently receive operating assistance from MnDOT.

MnDOT’s current program page states that applications opened August 3, 2026 and close September 30, 2026 at 11:59 p.m. Applications must be completed and submitted through the BlackCat Transit Data Management System by selecting the 2026 Application for the 2027 Technology Grant, creating a project, completing the required forms available inside BlackCat, and submitting the application online. MnDOT plans to post award notifications in December 2026 and send contracts in March 2027.

VERIFICATION HOLD: The public MnDOT program page verifies the current opportunity, issuer, eligibility, submission system, application dates, reporting requirements and the existence of current grant instructions and required BlackCat forms, but it does not publicly state the available funding pool or applicant award range, match/cost-share requirement, complete allowable/ineligible cost rules, exact public form list, or the time zone for the 11:59 p.m. September 30 deadline. The detailed 2026 Technology Grant Instructions are referenced by MnDOT but are available through the application environment rather than exposed on the public page reviewed in this run. Do not publish, create applicant-specific CRM pursuit, produce a package, or initiate ORIGINAL outreach until those material controls are authoritatively verified.

Strategic fit: Atlas Opportunity Score 62/100 conditional. The program has legitimate rural/community infrastructure value and can improve transportation access, including access to health and social services, but it is not a healthcare-specific solicitation. N9+ Fit 0/100 at program-control level. QC Healthcare Fit 0/100 at program-control level. Do not force healthcare technology into a transit-operations project.

Source verificationReferenced source · www.dot.state.mn.usAtlas last verified this record September 23, 2026. Always use the funder's current application materials, amendments and portal instructions as the controlling source.View source and application materials ↗