Dr. MiltieAtlas by Dr. Miltie™Healthcare Grant Intelligence
Active — bids due September 22, 2026Atlas Opportunity Score 27/100
HOLGATE-RENOVATIONS-2026South DakotaK-12 Education

South Dakota Aberdeen School District 06-1 Holgate Middle School Renovations 2026

FundingContract value or ceiling not stated in the published legal notice.
DeadlineSeptember 22, 2026 at 2:00 PM CST.
Last verifiedSeptember 14, 2026
Required next actionQualified construction contractors should obtain the complete Plans and Specifications, confirm all contract, bonding, insurance, addenda and alternate requirements, and deliver a sealed bid to the Aberdeen School District Finance Office before the deadline. No N9+ or QC Healthcare outreach is recommended.

Broad Eligibility

Qualified construction bidders able to provide complete general, material and labor work required by the Holgate Middle School Renovations construction documents. Bids above $50,000 are subject to the published bid-security requirement.

Atlas Analysis

Atlas Opportunity Score 27/100. N9+ Fit Score 0/100. QC Healthcare Fit 0/100. Direct Dr. Miltie fit 0/100. K-12 construction procurement only; no legitimate healthcare, remote-exam or clinical-services fit.

Aberdeen School District 06-1 is accepting sealed bids for Holgate Middle School Renovations in Aberdeen, South Dakota. The district legal notice states that bids will be received at the Finance Office, 1224 South Third Street, Aberdeen, SD 57401, with bid letting at September 22, 2026 at 2:00 PM CST in the Terry O’Keefe Conference Room at the District Service Center.

Bid documents and submission

Electronic Plans and Specifications are available in PDF format and through the listed builders exchanges. Technical questions are directed to Steve Savonen at CO-OP Architecture, LLC at 605-725-4852 or steven@co-oparch.com. Bids must be submitted to the Aberdeen School Board in a sealed envelope identifying the bidder and marked for the Holgate Middle School Renovations project. Faxed bids are not accepted, although faxed bid adjustments are permitted until bid opening and must be followed by a signed hard copy.

Bid security and contract conditions

No bidder may withdraw a bid for 30 days after bid opening without the owner’s written consent. Liquidated damages apply as detailed in the Bid Form, Agreement for Construction and General Conditions. For bids exceeding $50,000, the notice requires either a certified check, cashier’s check or draft equal to 5 percent of the base bid plus add alternates, or a bid bond of at least 10 percent of the bid amount issued by an authorized South Dakota surety. The public notice does not state an overall contract value or ceiling.

Atlas analysis

Atlas Opportunity Score: 27/100. N9+ Fit Score: 0/100. QC Healthcare Fit: 0/100. Direct Dr. Miltie fit: 0/100. This is a valid South Dakota K-12 construction procurement, but no legitimate role is established for the Nonagon N9+ device and platform or QC Healthcare. Atlas recommends publication for coverage only and no applicant outreach or direct pursuit.

Source verification: Aberdeen School District legal notice published August 13 and August 20, 2026 and reproduced by Aberdeen Insider; district identity and business-office details were cross-checked against the South Dakota Department of Education directory.

Source verificationReferenced source · aberdeeninsider.comAtlas last verified this record September 14, 2026. Always use the funder's current application materials, amendments and portal instructions as the controlling source.View source and application materials ↗