Opportunity Overview
Dorchester School District Two Partial Roof Replacement & Exterior Building Repairs at Eagle Nest ES & River Oak MS — IFB 2627-003 is a Design-Bid-Build school construction procurement at 8640 River Oaks Drive, North Charleston, South Carolina.
Deadline and Site Visit
A non-mandatory pre-bid site visit is scheduled for September 14, 2026 at 9:00 a.m. at Eagle Nest Elementary School. One original bid is due October 5, 2026 at 1:00 p.m. The official SCBO advertisement does not state a time zone.
Scope
The district describes the project as partial roofing replacement and exterior wall replacement at Eagle Nest Elementary School and River Oak Middle School. No construction cost range is published in the SCBO advertisement.
Contact and Documents
Agency project coordinator: April Courtney, apcourtney@dorchester2.k12.sc.us, 843-695-4423. Project documents are available from the Dorchester School District Two solicitations and awards website. The full district package controls plans, specifications, licensing, bonding, insurance, bid forms, references, addenda, and submission requirements.
Atlas Analysis
Atlas Opportunity Score: 48/100. This is a legitimate open K-12 capital project with a defined scope, site visit, and official district contact, but no public cost range is stated.
N9+ Fit Score: 0/100. Roofing and exterior-building work does not support the Nonagon N9+ remote physical examination platform.
QC Healthcare Fit: 0/100. No healthcare staffing or clinical-services role is established.
Direct-vendor disposition: No verified Dr. Miltie roofing, general-contracting, or exterior-building qualification exists in available records, so no direct submission is advanced.
Next Action
Qualified contractors should obtain the complete district package and verify contractor licensing, bonding, insurance, plans, bid forms, addenda, and submission requirements before bidding.
Official source: South Carolina Business Opportunities advertisement.