ActiveAtlas Opportunity Score 24/100
ITB 9126 Addendum 1Nevada

Western Nevada College Multi Campus Security Camera Project – ITB 9126

FundingEstimated project cost $800,000 to $900,000; no guaranteed award amount beyond the procurement estimate is stated in the public indexed record.
DeadlineOctober 1, 2026 at 2:00 PM PT (PDT on that date), per current indexed official portal data.
Last verifiedSeptember 13, 2026
Required next actionOnly firms that attended the mandatory September 10, 2026 pre bid job walk and meet the Authorized Avigilon Integrator, bonding, insurance, and experience requirements should pursue submission through Nevada Government eMarketplace.

Broad Eligibility

Current Authorized Avigilon Integrator; mandatory pre bid job walk attendance required; Avigilon authorization documentation, authorized personnel, years of experience and comparable projects; required insurance and bid, payment and performance bonds.

Atlas Analysis

Atlas Opportunity Score 24/100. N9+ Fit Score 0/100. Dr. Miltie/QC Healthcare direct vendor fit 0/100. Specialized physical security procurement with no verified N9+ or QC Healthcare role.

Opportunity Overview

Western Nevada College, through Nevada System of Higher Education BCN Purchasing, has issued ITB 9126 Addendum 1, WNC Multi Campus Security Camera Project. The procurement seeks a qualified current Authorized Avigilon Integrator to furnish, install, integrate, configure, program, commission, and support security camera systems across the Carson and Fallon campuses.

Estimated Value and Deadline

The estimated project value is $800,000 to $900,000. Current procurement indexing that reproduces the official Nevada Government eMarketplace portal data shows bids due October 1, 2026 at 2:00 PM PT, which is Pacific Daylight Time on that date. Electronic submission is through the official Nevada Government eMarketplace IonWave portal.

Eligibility and Required Qualifications

Bidders must be current Authorized Avigilon Integrators. The solicitation requires supporting Avigilon authorization information, including the partner or integrator name, authorization or certification number, authorized personnel, years of Avigilon experience, and comparable completed Avigilon projects. Insurance, bid bonding, payment bonding, performance bonding, and past performance are required.

A mandatory pre bid job walk occurred September 10, 2026. Current solicitation data states that firms had to attend in order to submit a bid and that a bid from a non attending bidder will be disqualified. Plans and specifications are provided to firms that attended the required job walk, and portal attachments may require login.

Scope and Schedule

The project includes equipment, materials, cabling, accessories, integration, configuration, programming, commissioning, and related work needed for complete operational systems in interior and exterior public spaces at the Carson and Fallon campuses. Work is scheduled to begin October 19, 2026 and be completed by February 26, 2027.

Atlas Analysis

Atlas Opportunity Score: 24/100. This is a legitimate, high value Nevada higher education procurement, but the work is narrowly specialized and the mandatory job walk has already occurred.

N9+ Fit Score: 0/100. The verified scope establishes no legitimate role for the Nonagon N9+ device and platform.

Dr. Miltie / QC Healthcare direct vendor fit: 0/100. The solicitation requires an Authorized Avigilon Integrator and specialized physical security installation qualifications. Atlas found no basis to represent Dr. Miltie or QC Healthcare as meeting those requirements.

Submission Mechanics

Match or cost share is not applicable because this is a vendor procurement. Bids are submitted electronically through Nevada Government eMarketplace. The procurement contact is Ryan Caddel at rcaddel@unr.edu or 775 784 6552.

Official source: Nevada Government eMarketplace / IonWave – ITB 9126.