Dr. MiltieAtlas by Dr. Miltie™Healthcare Grant Intelligence
ActiveAtlas Opportunity Score 5/100
Bid File 1298 / UM 23-136 / IHL 207-507Mississippi

University of Mississippi Gillom Sports Center Improvements – Bid File 1298

The University of Mississippi is accepting bids for Gillom Sports Center Improvements under Bid File 1298, UM Project 23-136 / IHL 207-507. Bids are due September 24, 2026 at 2:00 PM CT. No official contract ceiling is stated. N9+ and Dr. Miltie/QC direct-vendor fit are 0/100.

FundingOfficial maximum/total value not stated
DeadlineSeptember 24, 2026 at 2:00 PM CT
Last verifiedSeptember 19, 2026
Required next actionMonitor for addenda, amendments or award activity; no Dr. Miltie/QC direct pursuit.

Broad Eligibility

Open construction procurement for qualified contractors able to meet the University of Mississippi project manual, bid-security, licensing and responsibility requirements.

Atlas Analysis

N9+ Fit Score 0/100. QC Healthcare / Dr. Miltie direct-vendor fit 0/100. Atlas Opportunity Score 5/100 for direct pursuit.

Opportunity Overview

The University of Mississippi is soliciting construction bids for Gillom Sports Center Improvements, University project 23-136, IHL project 207-507, Bid File 1298.

Status and Deadline

The controlling University of Mississippi bid documents require bids by September 24, 2026 at 2:00 PM CT. Bids may be submitted electronically through the university Current Bids portal or by sealed paper delivery to Procurement Services.

Funding / Contract Value

No official contract ceiling or engineer’s estimate is stated in the publicly available controlling bid packet.

Plans, Pre-Bid and Submission

Plan holders must register and obtain documents through the University of Mississippi project planroom at universityofmsprojects.com and maintain a valid email address for project communications. A pre-bid conference was scheduled for September 10, 2026 at 2:00 PM at the John W. White Facilities Management Building, 700 Hathorn Road, University, Mississippi. The packet allows electronic submission through the university Current Bids portal or sealed paper submission under Bid File 1298.

Bid Security and Contractor Requirements

The bid requires proposal security in the form of a bid bond or certified check for at least 5% of the base bid. The outside of a paper bid envelope must show the bidder’s current Mississippi Certificate of Responsibility number and contractor license number where applicable, unless the statutory under-$50,000 statement applies. University construction terms also require applicable contractor compliance and project documentation controlled by the full project manual. Atlas does not infer bidder qualifications that are not documented in the controlling packet.

Contact and Addenda

Project questions are directed to PryorMorrow, P.C., 2151 Highway 18, Suite A, Brandon, MS 39042, telephone 662-327-8990, with the packet identifying jherrington@pryor-morrow.com. No separate addendum is listed for Bid File 1298 on the university Current Bids page as of verification. Vendors are responsible for checking the university site for updates and addenda.

Atlas Analysis

N9+ Fit Score: 0/100. The Nonagon N9+ remote physical examination platform is unrelated to this construction scope.

QC Healthcare / Dr. Miltie direct-vendor fit: 0/100. Atlas has no verified construction licensing, bonding, contractor responsibility or project-performance basis for Dr. Miltie or QC Healthcare to bid this work.

Atlas Opportunity Score: 5/100 for direct pursuit.

Atlas Action

Published as verified Mississippi higher-education procurement intelligence. No CRM Deal, WorkDrive pursuit folder, task, applicant record or outreach is created because no legitimate Dr. Miltie/QC direct-pursuit path is established.

Official source: University of Mississippi Procurement Services Current Bids page and Bid File 1298 solicitation packet. Atlas verified September 11, 2026.

Source verificationReferenced source · secure24.olemiss.eduAtlas last verified this record September 19, 2026. Always use the funder's current application materials, amendments and portal instructions as the controlling source.View source and application materials ↗