Dr. MiltieAtlas by Dr. Miltie™Healthcare Grant Intelligence
Open — applications are currently being accepted; deadline extended to October 5, 2026 at 5:00 PM EST.Atlas Opportunity Score 92/100

Georgia 2023–2024 Hurricane CDBG-DR Competitive Infrastructure Program — 2026

Georgia DCA has opened the 2023–2024 Hurricane CDBG-DR Competitive Application Infrastructure Program for eligible local governments in 44 Most Impacted and Distressed counties. The program has $50 million allocated, no required match, and no maximum award for MID counties. The extended application deadline is October 5, 2026 at 5:00 PM EST.

Funding$50,000,000 total program allocation. HUD-approved action plan states there is no maximum award for MID counties; awards are based on identified need and duplication-of-benefits analysis.
DeadlineOctober 5, 2026 at 5:00 PM EST (extended deadline published by Georgia DCA).
Last verifiedSeptember 25, 2026
Required next actionIdentify eligible Georgia MID local governments with a documented 2023-2024 hurricane infrastructure need and project readiness. Before ORIGINAL outreach, verify project tie-back, national-objective eligibility, current DCA compliance, authoritative business Contact, Email_Opt_Out, permanent hard bounce, Deal, Atlas_Email_Queue, authoritative prior-send, and cross-lane deduplication. Do not infer project facts.

Broad Eligibility

Units of general local government located within one of the 44 eligible Most Impacted and Distressed Georgia counties. Proposed infrastructure activities must have a clear tie-back to the 2023-2024 federally declared disasters, be CDBG-eligible or covered by an applicable HUD waiver, and meet an applicable CDBG-DR national objective.

Atlas Analysis

Atlas Opportunity Score 92/100. $50 million competitive infrastructure program, no required match, no MID-county award cap, and a verified current deadline. Strong Atlas fit for eligible local governments with documented disaster-related infrastructure needs. N9+ Fit 0/100. QC Healthcare Fit 0/100. ORIGINAL outreach requires applicant-specific project and compliance verification before queue creation.

Opportunity Overview

The Georgia Department of Community Affairs (DCA) is accepting applications for the 2023–2024 Hurricane CDBG-DR Competitive Application Infrastructure Program. The program supports disaster-recovery infrastructure projects in Georgia communities affected by Hurricane Idalia, Tropical Storm Debby, and Hurricane Helene.

Funding and Deadline

DCA’s HUD-approved action plan allocates $50,000,000 to the Competitive Application Infrastructure Program. The action plan states there is no maximum award for MID counties; awards are calculated based on identified need and duplication-of-benefits analysis.

The application deadline has been extended to October 5, 2026 at 5:00 PM EST. Applications must be submitted through DCA’s official online application portal.

Eligible Applicants and Geography

The current Infrastructure Applicant Policy Manual states that DCA will accept proposals only from units of general local government located within eligible Most Impacted and Distressed (MID) counties. The 44 eligible counties are Appling, Atkinson, Bacon, Ben Hill, Berrien, Brooks, Bryan, Bulloch, Burke, Candler, Chatham, Clinch, Coffee, Colquitt, Columbia, Cook, Effingham, Emanuel, Evans, Glynn, Jeff Davis, Jefferson, Jenkins, Johnson, Lanier, Laurens, Liberty, Lincoln, Long, Lowndes, McDuffie, Pierce, Richmond, Screven, Tattnall, Telfair, Tift, Toombs, Treutlen, Ware, Washington, Wayne, Wheeler, and Wilkes.

Eligible Activities

Eligible activities must rebuild or replace storm-impacted public facilities or improvements and demonstrate a clear tie-back to the federally declared disasters. Examples include water, sewer and stormwater systems, streets and bridges, drainage systems, and public facilities. Each activity must be CDBG-eligible or covered by an applicable HUD waiver, be located in a MID county, and meet an applicable CDBG-DR national objective.

Equipment purchases are generally ineligible unless the equipment is an integral part of an eligible public facility, constitutes all or part of an eligible public service, or becomes an integral fixture. Mobile command centers, radios, and portable lights are specifically identified as ineligible.

Match and Project Requirements

No match is required. DCA encourages leverage of additional resources. Recipients must expend 100% of awarded funds within 36 months of the grant award unless DCA approves an extension.

Applicants must comply with applicable state planning and financial-reporting laws, procurement requirements, duplication-of-benefits controls, environmental review requirements, citizen-participation requirements, and all required application forms and certifications. Professional procurements for grant application/administration and engineering or architectural services must comply with the manual’s procurement rules.

Atlas Analysis

Atlas Opportunity Score: 92/100. This is a large, currently open Georgia-administered disaster-recovery infrastructure opportunity with a verified deadline, no required match, and no applicant-level award cap for MID counties. Applicant-specific pursuit still requires a documented eligible disaster tie-back, project readiness, compliance status, and competitive project case.

N9+ Fit: 0/100. The current infrastructure rules generally disfavor equipment purchases and do not establish a defensible N9+ procurement pathway.

QC Healthcare Fit: 0/100. Although public facilities can be eligible, the current program is infrastructure-focused and does not establish a direct healthcare-vendor opportunity.

Original Outreach Gate

Do not create ORIGINAL outreach for a local government until Atlas verifies a specific eligible project and disaster tie-back, confirms the local government is in an eligible MID county and in compliance with applicable DCA requirements, verifies an authoritative business Contact and Email Opt-Out/permanent-bounce status, and clears Deal, Atlas_Email_Queue, prior-send, and cross-lane deduplication.

Official source: Georgia DCA 2023/2024 Infrastructure Program.

Source verificationOfficial government source · dca.georgia.govAtlas last verified this record September 25, 2026. Always use the funder's current application materials, amendments and portal instructions as the controlling source.View source and application materials ↗