Dr. MiltieAtlas by Dr. Miltie™Healthcare Grant Intelligence
Verification hold — complete OGS/Bid Express package and addenda required before publication or outreach
NYS-OGS-47638-MANHATTAN-PC-CENTRAL-UTILITY-PLANTNew York

New York OGS Manhattan Psychiatric Center Central Utility Plant Upgrades — Project 47638

FundingEstimated construction cost: $2,000,000 to $3,000,000 for Contract 47638H, per the official OGS public project page.
DeadlineOctober 7, 2026. The official OGS public project page reviewed by Atlas does not state an exact bid-receipt time or time zone.
Last verifiedSeptember 20, 2026
Required next actionObtain and review the complete OGS/Bid Express solicitation package and all addenda. Verify bidder qualifications, licensing, bonding, insurance, PLA requirements, specifications, required forms and attachments, submission mechanics, exact bid-receipt time/time zone if published in the controlling documents, and all material restrictions before publication, direct-vendor classification, or outreach.

Broad Eligibility

Open OGS Design & Construction procurement for qualified contractors. Public-page evidence identifies Contract 47638H, goals, cost range, bid deposit, pre-bid meeting, PLA, and Wicks-exempt status; complete bidder qualifications remain to be verified from the controlling solicitation package.

Atlas Analysis

Potential Atlas-relevant healthcare-facility capital procurement at Manhattan Psychiatric Center. Publication and outreach are withheld pending full controlling bid-package verification. N9+ fit and QC Healthcare fit are not classified from the public summary alone.

Verification hold. New York State Office of General Services currently lists Project 47638 for central utility plant upgrades at Manhattan Psychiatric Center, Building 134, 600 East 125th Street, New York, with bids to be received October 7, 2026. The public OGS project page lists a September 22, 2026 pre-bid meeting at 10:00 AM, a Project Labor Agreement, Wicks exemption, Contract 47638H, a 30% MWBE goal, a 6% SDVOB goal, an estimated cost of $2 million to $3 million, and a $78,900 bid deposit.

The accessible public page does not state an exact bid-receipt time or time zone. The complete Bid Express solicitation package and current addenda must be reviewed before Atlas publication, direct-vendor classification, or outreach so bidder qualifications, licensing, bonding, insurance, mandatory forms, specifications, submission mechanics, amendments, and all material restrictions can be verified.

No outreach is authorized while this verification hold remains in place.

Source verificationOfficial government source · online2.ogs.ny.govAtlas last verified this record September 20, 2026. Always use the funder's current application materials, amendments and portal instructions as the controlling source.View source and application materials ↗