Open — Rolling October 1–September 30 application cycleAtlas Opportunity Score 72/100
USDA-RD-RUS-EILP

USDA Rural Development Electric Infrastructure Loan & Loan Guarantee Program — Rolling 2026

FundingLoan guarantees may finance up to 100% of an approved construction work plan. USDA does not publish a single national per-borrower award cap on the current program page.
DeadlineOpen — applications accepted on an ongoing October 1–September 30 cycle through a Rural Utilities Service General Field Representative. No single national clock-time cutoff is stated.
Last verifiedSeptember 14, 2026
Required next actionRoute only when a qualifying electric distribution, generation, or transmission provider and a rural service-area resilience need are independently verified. Confirm legal authority, rural eligibility, construction work plan, engineering/environmental requirements, current RUS forms, and financing terms before applicant-specific action.

Broad Eligibility

Most retail or power-supply providers serving qualified rural areas may be eligible, including state and local governments, federally recognized Tribes, nonprofit cooperatives and associations, and for-profit corporations or LLCs that furnish or improve electric service.

Atlas Analysis

Atlas Opportunity Score: 72/100. N9+ Fit Score: 0/100. The program can strengthen electric reliability for rural hospitals, clinics, EMS facilities, schools, and other essential community institutions, but the direct USDA borrower must be an eligible electric-service provider. Dr. Miltie direct-applicant/vendor fit is 0/100 absent a separately verified qualifying utility relationship.

USDA Rural Development currently lists the Electric Infrastructure Loan & Loan Guarantee Program as open. Applications are accepted for processing from electric distribution, generation, and transmission providers serving eligible rural areas on an ongoing October 1–September 30 cycle.

Rural healthcare and community resilience relevance

This is not a healthcare grant. It finances the electric infrastructure that rural hospitals, clinics, EMS facilities, schools, Tribal facilities, and other essential community institutions depend on. Eligible uses include maintenance, upgrades, expansion, and replacement of distribution, subtransmission, and headquarters facilities, along with energy efficiency and renewable energy systems. Projects that improve electric reliability and resilience in rural service territories can therefore materially support continuity of care and emergency operations, but the direct applicant must be an eligible electric-service provider.

Who may apply

USDA identifies most retail or power-supply providers serving qualified rural areas as potentially eligible, including state and local governmental entities, federally recognized Tribes, nonprofit organizations including cooperatives and limited-dividend or mutual associations, and for-profit corporations or limited liability companies. Rural eligibility is determined with USDA Rural Utilities Service staff based on the proposed service area.

Financing structure

USDA states that Federal Financing Bank loan guarantees may finance up to 100 percent of an approved construction work plan. Repayment generally may not exceed the useful life of the financed facility and is capped at 35 years. Loan guarantee and Treasury-rate loan interest is fixed at the time of each advance using the applicable U.S. Treasury rate plus one-eighth of one percent. Hardship loans may be available at USDA discretion for economically distressed areas or unavoidable events and are listed at a 5 percent fixed rate for up to 35 years. USDA does not publish a single national per-borrower award cap on the current program page.

Atlas assessment

Atlas Opportunity Score: 72/100. The program is a strong infrastructure-resilience pathway for rural communities but only an indirect healthcare opportunity because eligible electric providers, not hospitals or clinics merely as end users, are the direct USDA borrowers.

N9+ Fit Score: 0/100. The current program authority is focused on electric utility infrastructure, energy efficiency, and renewable systems rather than medical equipment procurement.

Dr. Miltie direct-applicant/vendor fit: 0/100. No direct Dr. Miltie eligibility is established because the direct applicant must furnish or improve electric service in a qualifying rural area. A legitimate role would require a separate, independently verified utility or project relationship and must not be assumed.

Application controls

Applications are accepted year-round through a Rural Utilities Service General Field Representative. Before routing any organization-specific opportunity, verify the utility applicant, rural service-area eligibility, legal authority, public-purpose requirement, construction work plan, engineering and environmental requirements, financing structure, and current RUS forms and certifications. Do not treat this program as a grant to a hospital, clinic, school, or other end-user facility.

Official source: USDA Rural Development — Electric Infrastructure Loan & Loan Guarantee Program.

Source verificationOfficial government source · www.rd.usda.govAtlas last verified this record September 14, 2026. Always use the funder's current application materials, amendments and portal instructions as the controlling source.View source and application materials ↗