Closed / Expired — Round 2 application deadline passed September 15, 2026 at 3:00 PM ETAtlas Opportunity Score 92/100

New York NYSERDA Empire Building Challenge: Hospitals — PON 5989 Round 2

NYSERDA PON 5989 Round 2 offers New York hospitals up to $5 million per project, capped at 75% of eligible project cost, for existing-building decarbonization and energy-efficiency projects. Applications are due September 15, 2026 at 3:00 PM ET. A completed feasibility study or equivalent analysis is required before submission.

FundingUp to $5,000,000 per project, capped at 75% of total eligible project cost. The hospital must cover at least 25% of project cost from other sources. Selected projects may also be eligible for an additional $50,000 for operations and maintenance training.
DeadlineSeptember 15, 2026 at 3:00 PM Eastern Time (Round 2). Fewer than 48 hours remained at Atlas verification, so no new applicant outreach may begin for this round.
Last verifiedSeptember 19, 2026
Required next actionFor hospitals already preparing a proposal, verify the existing-hospital building definition, completed feasibility study or equivalent analysis, at least 25% non-NYSERDA project cost, internal approval status, current Attachment A / equivalent response format, Attachment B Proposal Workbook, feasibility report and portal requirements; submit through the NYSERDA portal by September 15, 2026 at 3:00 PM ET. Do not begin new cold outreach for Round 2 because the 48-hour cutoff has passed.

Broad Eligibility

The proposer must be a New York State hospital or legal representative authorized to act on behalf of a hospital; the hospital remains the proposer and contracting party. Funding must support existing hospital buildings primarily providing acute, short-term medical and surgical care. A completed feasibility study or equivalent analysis is required before submission. New construction and non-hospital facility types are not independently eligible.

Atlas Analysis

Atlas Opportunity Score 92/100. Up to $5 million per project, capped at 75% of eligible cost, for scalable hospital electrification and energy-efficiency construction. N9+ Fit 5/100 conditional because energy-efficient medical equipment is only a contingent eligible activity when paired with a core eligible project and supported by actual energy-savings evidence. QC Healthcare / Dr. Miltie direct-applicant fit 0/100 because the hospital must be the proposer and contracting party. New applicant outreach is closed under the Atlas 48-hour rule for the September 15, 2026 Round 2 deadline.

Opportunity Overview

The New York State Energy Research and Development Authority (NYSERDA) is accepting Round 2 proposals under PON 5989, Empire Building Challenge: Hospitals. The program funds demonstration projects in existing New York hospital buildings that can deliver meaningful, scalable and replicable reductions in energy use and greenhouse-gas emissions.

Funding and Cost Share

Eligible hospitals may request up to $5 million per project. NYSERDA funding may cover no more than 75% of total eligible project cost, so the project must have at least 25% of cost covered from other sources. Awards are milestone based. NYSERDA also states that selected projects may be eligible for an additional $50,000 for operations and maintenance training on newly installed equipment and building systems.

Deadline

Round 2 applications are due September 15, 2026 at 3:00 PM Eastern Time. Because fewer than 48 hours remain, Atlas will not begin new applicant outreach for this round. Publication remains appropriate so already prepared New York hospitals can act on the verified opportunity.

Who May Apply

The proposer must be a New York State hospital, or a legal representative authorized to act on behalf of the hospital, and the hospital itself remains the proposer and contracting party. The eligible facility must be an existing hospital building primarily providing acute, short-term medical and surgical care, including diagnosis, treatment and inpatient housing. Nursing homes, psychiatric hospitals, rehabilitation centers, urgent care facilities, laboratories and research facilities, ambulatory care facilities, and medical offices do not independently satisfy the program definition.

New construction is not eligible. A feasibility study or equivalent analysis must be completed before proposal submission, and a copy must be included with the proposal. NYSERDA’s FlexTech program may separately support part of feasibility-study costs.

Eligible Project Activities

Core eligible work includes heating and cooling electrification, electrification-readiness upgrades, and comprehensive energy-efficiency improvements. Examples include heat pumps, VRF systems, thermal energy networks, steam-to-hot-water conversion, domestic hot-water electrification, envelope improvements, and other measures that reduce building thermal load, energy use, and emissions.

Certain measures are only eligible when paired with a core eligible activity, including energy-efficient medical-equipment upgrades or operating improvements that produce energy savings, electrical infrastructure upgrades, energy storage, and renewable-energy technologies. Lighting-only work, fossil-fuel system conversions, EV or fleet work, EV charging, and new construction are not eligible.

Important Cost and Construction Controls

NYSERDA funding is for eligible installation materials and labor. Third-party consulting, design, recommissioning, and third-party measurement and verification costs are not eligible for PON 5989 funding. Construction, purchase, or installation performed before an executed NYSERDA agreement is not eligible for reimbursement. The FAQ also states that NYSERDA and utility incentives cannot fund the same measure.

Application Package

Applicants submit through the NYSERDA online portal. The current FAQ confirms that proposers may complete Attachment A, Proposal Template, or submit a separate document that follows Attachment A’s format and answers every question. The program also uses Attachment B, Proposal Workbook. The completed feasibility study or equivalent analysis must be included. Supporting documentation demonstrating approval from the hospital’s CEO, CFO, COO, board, or other decision-making body may strengthen the proposal.

Atlas Analysis

Atlas Opportunity Score: 92/100. This is a large, verified New York hospital capital and infrastructure opportunity with up to $5 million available per project and a clearly defined 75% funding cap. The deadline is imminent, so this round is actionable primarily for hospitals that already completed feasibility work and have internal project approval.

N9+ Fit Score: 5/100 conditional. The solicitation can support energy-efficient medical-equipment upgrades only as contingent activities paired with a core electrification or energy-efficiency project and only where measurable energy savings are established. No N9+ role should be assumed or introduced without applicant-specific engineering evidence and cost eligibility. QC Healthcare / Dr. Miltie direct-applicant fit: 0/100 because the hospital must be the proposer and contracting party.

Next Action

Hospitals already preparing a Round 2 proposal should confirm facility eligibility, completed feasibility analysis, at least 25% non-NYSERDA project funding, project approval status, all current portal attachments and workbook requirements, and submit the complete proposal before September 15, 2026 at 3:00 PM ET. Atlas should not initiate new cold outreach for this round because the 48-hour outreach cutoff has passed.

Verified sources: NYSERDA Empire Building Challenge: Hospitals program page, PON 5989 solicitation portal, current NYSERDA funding-opportunities listing, and PON 5989 FAQ.

Source verificationOfficial government source · www.nyserda.ny.govAtlas last verified this record September 19, 2026. Always use the funder's current application materials, amendments and portal instructions as the controlling source.View source and application materials ↗