Open - Draft verification hold; deadline time zone unresolved and mandatory September 11 project meeting has passedAtlas Opportunity Score 66/100
RFQ 2026-02Oregon

Oregon Athena-Weston School District May 2026 Bond Progressive Design-Build RFQ – RFQ 2026-02

Funding$8,800,000 project budget for design, construction and soft costs; broader bond plus ODE match totals $9,960,000
DeadlineSeptember 24, 2026 at 2:00 PM; time zone not stated in the RFQ
Last verifiedSeptember 23, 2026
Required next actionFAIL CLOSED. Keep Draft. Do not create ORIGINAL outreach. The official Athena-Weston School District notice confirms qualifications are due September 24, 2026 at 2:00 PM, but it does not identify the controlling time zone. The mandatory in-person project information meeting was September 11, 2026 and has passed. Re-open applicant-specific action only if authoritative district procurement materials establish the deadline time zone and the prospective respondent's compliance with the mandatory meeting and other RFQ prerequisites is verified.

Broad Eligibility

Qualified progressive design-build firms able to meet the RFQ's bonding, insurance, documentation, and K-12/CTE experience requirements.

Atlas Analysis

Atlas Opportunity Score 66/100. N9+ Fit Score 0/100. School-capital progressive design-build procurement with no legitimate N9+/QC clinical-technology fit; Dr. Miltie/QC No Bid.

Opportunity Overview

Athena-Weston School District is soliciting Statements of Qualifications from design-build firms under RFQ 2026-02 for the District’s May 2026 Bond Progressive Design-Build Project. The project centers on a new approximately 12,000-square-foot Career, Trades, Sciences, and Technical Education Center plus minor renovations at Weston-McEwen High School.

Funding and Project Budget

The District states that voters approved a $4,980,000 general obligation bond on May 19, 2026, paired with a $4,980,000 Oregon Department of Education matching grant, for a broader capital-program total of $9,960,000. The RFQ identifies $8,800,000 as the budgeted cost for design, construction, and soft costs for this procurement.

Deadline and Procurement Schedule

Qualifications are due September 24, 2026 at 2:00 PM. The RFQ does not state the time zone. Electronic SOQs are accepted by the Owner’s contact, Shea White of Wenaha Group, at sheaw@wenahagroup.com. A mandatory in-person Project Information Meeting is scheduled for September 11, 2026 at 2:00 PM at Athena Elementary School, 375 S 5th St., Athena, Oregon. Questions are due September 15 at 2:00 PM, and owner addenda are anticipated September 18.

Scope

The new center is expected to include art classrooms, metal and wood shops, general science labs with storage, a multipurpose classroom with agricultural-science space, additional parking, energy-efficient building systems, and modern ADA accessibility. The selected team will also help establish and prioritize the scope for minor renovations at Weston-McEwen High School. The District plans a progressive design-build agreement with a Guaranteed Maximum Price after project scope and basis-of-design development.

Minimum Qualifications and Submission Requirements

Mandatory minimum requirements include the ability to obtain performance and payment bonding for at least $10,000,000 and documentation showing the proposer can meet the District’s insurance requirements. The SOQ must address technical and management qualifications relevant to K-12 and career/technical-education facilities and progressive design-build delivery. Required materials include a letter of interest, bonding and insurance evidence, key-team resumes, an Identification of Projects Table, Responsibility Determination Form, Signature Sheet, and Certification of Non-Discrimination. The SOQ body is generally limited to 25 pages and must be submitted as a searchable PDF.

Atlas Analysis

Atlas Opportunity Score: 66/100. N9+ Fit Score: 0/100. This is a meaningful Oregon school-capital procurement, but the verified requirement is progressive design-build construction. It does not present a legitimate Nonagon N9+ remote physical examination, guided-vitals, telehealth-enabled clinical encounter, or current QC Healthcare direct-vendor use case. Dr. Miltie/QC is therefore No Bid on the verified scope.

Official Source and Next Action

Prospective respondents should review the complete RFQ and all exhibits on the Athena-Weston School District website, attend the mandatory project information meeting, and monitor the District website for addenda before submission.

Source verificationReferenced source · www.athwest.smartsiteshost.comAtlas last verified this record September 23, 2026. Always use the funder's current application materials, amendments and portal instructions as the controlling source.View source and application materials ↗